SDC M40 Campus

A proposed campus of up to three hyperscale data-centre buildings with an approximate combined IT load of 300 MW and an integrated on-site energy generation centre.

Project overview

Development information

DeveloperSlough Holdings UK Limited
OperatorNot published
LocationWapseys Wood landfill site, Buckinghamshire
Town or areaWapseys Wood
UK regionSouth East
Project stagePre-application
Project typeData-centre campus with integrated energy generation
Proposed capacity300 MW
Buildings proposed3
Expected submissionMarch 2027
Expected openingNot published
Planning referenceEN0110030
Project description

What is proposed?

A proposed campus of up to three hyperscale data-centre buildings with an approximate combined IT load of 300 MW and an integrated on-site energy generation centre.

Development status

This project is recorded separately from operational data-centre facilities. Inclusion in the development tracker does not mean that construction or operation is guaranteed.

Tracker methodology

How this project is classified

Project records describe proposed or developing infrastructure. They remain separate from the operational facility directory until reliable evidence confirms that a named facility has entered service.

Capacity and timetable information may change as a project moves through consultation, planning, construction and commissioning.